top of page

Professional Group

Public·16 members

Egor Koshelev
Egor Koshelev

Tamilnadu Pwd Building Practice Standard Data Book Tarmanl



Where there is space, of course, building a double-wide pad is one acceptable option under this rule. However, the combination of a pad of normal width and standard operational practices may also suffice. (Such practices could be offered as an equivalent facilitation.) For example, buses on either side of the island could stop at staggered locations (i.e., the bus on the left side could stop several feet ahead of the bus on the right side), so that even when buses were on both sides of the island at once, their lifts could be deployed without conflict. Where it is possible, building the pad a little longer than normal size could facilitate such an approach. In a situation where staggered stop areas are not feasible, an operational practice of having one bus wait until the other's lift cycle had been completed could do the job. Finally, the specification does not require that a pad be built at all. If there is nothing that can be done to permit lift deployment on both sides of an island, the buses can stop on the street, or some other location, so long as the lift is deployable.




Tamilnadu Pwd Building Practice Standard Data Book tarmanl


About

Welcome to the group! You can connect with other members, ge...

Members

9162172252

©2021 by Folsom Realtor Tour. Proudly created with Wix.com

bottom of page